|
|
This chemical metering system was designed and built from pre-specified components. Customer application: dust suppression system in a coal power plant. Responsibilities: Detail design from schematics;
hands-on steel fabrication; paint; mechanical and electrical assembly.
|
|
Burrowes Engineering 720-270-1243
|